Civil Infrastructure.
Essential infrastructure, built without interruption
Fuller builds and upgrades municipal water and wastewater infrastructure, including treatment facilities, pumping stations, process systems and civil works, along with the electrical, controls and commissioning work that ties them together.
Much of this work happens in facilities that can’t go offline. We plan around continuity of service, shutdowns, bypass and flow control, environmental requirements, and long-lead equipment. We then carry the project through testing and start-up to an orderly handover to your operations staff.
Trusted
Experienced
Proven
Proven in facilities where service can’t stop
We’ve delivered water, wastewater and other civil infrastructure projects while communities kept running.
Each project below shows how we plan around operating constraints, manage risk and bring complex civil infrastructure systems safely into service.
Cliff Park and Escarpment Stabilization
A complex structural and environmental project at Cliff Park, restoring and safeguarding a prominent Ottawa landmark.
Scope
The project involved heavy structural rehabilitation to stabilize the escarpment north of the Supreme Court of Canada. We installed rock anchors, barriers, fencing, shotcrete and wire mesh. We also executed a comprehensive landscaping upgrade of Cliff Park, including the removal of the old parapet wall and invasive non-native trees, and construction of a new retaining wall.
Challenges
The team faced several challenges, including navigating vertical construction and fluctuating water levels driven by the nearby Ottawa River. Tight physical access, steep terrain, highly complex site conditions and sensitive environmental considerations demanded rigorous engineering precision to prevent damage to the surrounding natural habitat.
Success
Fuller delivered a major escarpment stabilization that secured the historic rockface. Through meticulous trade coordination, we safely restored the site, ensuring its long-term structural integrity and public safety for users of both Cliff Park and the National Capital Commission’s recreational pathway along the Ottawa River.
Robert O. Pickard Environmental Centre
Scope
Challenges
Success
Explore our civil infrastructure work
Treatment facilities, pumping stations and the civil works that connect them.
Browse our completed water, wastewater and other civil infrastructure projects across Ottawa and surrounding communities. Sort by date or name to find the work most relevant to your next project.
Planning a water or wastewater project?
Ottawa, ON
K2B 8H6
"*" indicates required fields
